Joseph Blake – Water Treatment Plant – Phase 1

In order to increase process capacities and meet the Colorado Department of Public Health and Environment design criteria requirements, ProCraft was responsible for improving the pretreatment process and backup power system of this vital treatment plant. The work on this 28,000 sq. ft water treatment plant began in 2022 and is scheduled for completion in the spring of 2024.

This remodel project required the flexibility to work over existing treatment tanks as we installed new ventilation, exhaust, and make-up air systems. A caustic and seismic design project, our efforts in the upgrading of flocculation and sedimentation systems also involved preparing and installing heavy-duty hangars and lined aluminum spiral ductwork.

  • 28,000 SF Water Treatment Plant
  • Owner, Centennial Water and Sanitation District
  • General Contractor, Garney Construction
  • Centennial, CO